Max DittmanDownload Resume
← Back to Experience
Toyota Motor North America logo

Toyota Motor North America

Bodyweld Production Engineering | Toyota Motor Manufacturing Indiana

Princeton, IN · Aug 2024 – Dec 2024

BRIEF

Engineered process specs and robotic tooling studies for a new BEV fender assembly line at Toyota Motor Manufacturing Indiana.

30+
Page Process Spec
3
Tooling Processes Studied
$250k+
Saved via Error Catches
6
Dev Events Organized
WORK

At Toyota Motor Manufacturing Indiana, I worked within Bodyweld Production Engineering on the launch of a new BEV fender assembly line. I authored a detailed 30+ page process specification and instruction document, benchmarking fender processes at TMC Japan and Toyota Motor Manufacturing Kentucky to establish best practices. I completed comprehensive training on the Toyota Production System, Toyota Process Creation, and Improvement Methods. Using SolidWorks, I performed reach and feasibility studies on Kawasaki robotic weld tooling for three different processes. Late in planning, I caught three critical errors and built countermeasures for each, saving an estimated $250,000+. Beyond my engineering work, I organized six professional development events for co-ops to build skills and facilitate networking across the plant.

OUTCOMES
01Developed detailed 30+ page process specification and instruction for new BEV fender assembly
02Performed reach and feasibility studies on Kawasaki robot and weld tooling for 3 different processes
03Identified 3 critical errors in late-stage planning and created countermeasures saving an estimated $250,000+
04Planned and hosted 6 professional development events and facility tours for co-ops
Stack ·[SolidWorks][Process Engineering][Toyota Production System][Robotics]

Gallery

Toyota Motor North America image 1Toyota Motor North America image 2Toyota Motor North America image 3Toyota Motor North America image 4Toyota Motor North America image 5